On 06.08.2020 W&H project manager Wulfram Overmann presented the results of a feasibility study prepared between January and April 2020 in cooperation with INROS LACKNER during a public meeting of Guben’s commitee for economy, urban development, construction, housing and energy.
The study analysed the potential as well as the technical and economic options of a rail terminal within the Industrial Zone Guben South.